KolKay Electric is grateful to be chosen for the new Barrio Latin Grill by Backman Building Group. The Barrio Latin Grill is being built by the owner of Purple Café and Wine Bar located in Woodinville, Seattle and Kirkland. The restaurant is located at 12th and Madison in the Trace Lofts building.

Barrio Latin Grill and Bar

-located in Ravensdale, WA

Jensen Drilling and CA Carey -   “Howard Hanson Dam Additional Water Supply Project - Fish Passage Facility Final Excavation and Tunneling.” Electrical support for dewatering pumps, temporary power/lights, and mobilization-demobilization.   

Howard Hanson Dam

-located in Bellevue Square

Dental Office Addition/Remodel -  Dental office addition with 5 new examination rooms and one new oral surgery room. Remodel of lobby to add more sitting area for larger office capacity.

Bright Now! Dental

KolKay Electric was honored to be chosen for the installation of a Temp Power Generation Plant that serves as back up power to support all of SeaTac Airport. This installation was acquired due to the ongoing emergency repairs of the Howard Hanson Dam. This project was led by PCS, Casne Engineering, and Port of Seattle.

Provided and installed 2 new control panels for lift station #4 and #5 at the SeaTac Airport. Installed and coordinated all needed power and control conduits in an explosion proof classified area.

Installation of power and communication raceways in support of the new Sound Transit Light

Rail Station. This included coordination with PCS and the GC for the light rail walk way.

SeaTac Airport 18 Megawatt Temp Power Generation Plant

SeaTac Airport Sound Transit Walk Way

SnowMelt Pump Stations #4 and #5

-located at SeaTac Airport

Tenant Improvement Build Out of a new Buckle Jeans store in Bellevue Square. We are pleased to have built this job on time and in budget. The job included power, lighting, and distribution.

Buckle Jeans

-located in Bellevue Square

Covington Water District

Sugarloaf Well #3 Pump Station Standby Generator Installation. Coordinate and install a 55 KW Kohler diesel powered generator. The project included excavation, generator pad, placement, testing and demonstration.

PacSun

Tenant Improvement for PacSun in Bellevue Square. The build out included new electrical service, fire alarm, temporary power/lighting, and low voltage sound system install.